Holes were required for the insertion of bollards in Wynyard Quarter.
Bollards are one feature of an approach to design known as streetscaping.
Our operator was required to drill through pavement, base course, and concrete to a depth of 320mm.
Holes were required for the insertion of bollards in Wynyard Quarter.
Bollards are one feature of an approach to design known as streetscaping.
Our operator was required to drill through pavement, base course, and concrete to a depth of 320mm.